OwnerBuild OS
Step 1 · find the block

Block checker

Start typing a WA street address and matching blocks will appear below.

From the local planning scheme

Official bush fire prone area mapping

State or local heritage listing on the place or area

If not, you are treating effluent on site

Including anything you'd clear for driveway, pad or tanks

Fall changes earthworks, retaining and footings

Otherwise rainwater tanks or a bore

Grid connection or stand-alone system

Existing crossover and road frontage

Check the certificate of title and a property interest report

Class determines the owner-builder threshold

Step 2 · define the proposal

New work and alterations can follow different exemption paths

This needs the actual design and any local policy variations

Heritage status can remove ordinary planning exemptions

Include excavation, retaining, scaffolding and boundary work

Building as an owner-builder

Not using a registered builder

Yes

Doing the physical work yourself (DIY)

You build it, except plumbing, electrical and gas, which must stay with licensed trades

No
Bushfire attack level

This block needs a BAL assessment

Designated bushfire prone land. An accredited assessor classifies the vegetation and slope, then issues the rating your drawings and building surveyor have to follow.

BPAD-accredited assessor, report and certificate

$300 – $800

HomeBuild HQ, BAL assessment cost guide (Jul 2026) · checked 2026-07

Bushfire management plan prepared with the BAL report

$1,500 – $4,000

HomeBuild HQ, BAL assessment cost guide (Jul 2026) · checked 2026-07

Send the assessor
  • Site plan showing the proposed building footprint and setbacks
  • Feature survey or contour levels showing slope under the classified vegetation
  • Certificate of title and lot details
  • Access arrangements for the site visit, including gates and locks
Conditions that come with it
  • The rating applies to the assessed building envelope. Move the house and the rating must be reassessed.
  • Vegetation classification assumes the surrounding vegetation as it stands. Neighbouring regrowth can change it.
  • Any asset protection zone in the plan must be maintained for the life of the building.

Timing: 1 to 5 days for a quote once the assessor has the site plan; 5 to 15 business days from site visit to report in most Perth and peri-urban work.

WA legal questions

What can be answered now

Pack wa-2026.09.18

Do I need a building permit?

Required

A building permit is required.

Do I need development approval?

Cannot determine yet

The statewide mapping is not enough for a final planning answer.

Do I need owner-builder approval?

May be required

Owner-builder approval is likely, but the current threshold and eligibility facts must be checked.

Do I need onsite wastewater approval?

Cannot determine yet

Sewer availability must be confirmed.

Do I need adjoining-owner consent?

Cannot determine yet

The effect on adjoining land has not been assessed.

What is required when permitted work is complete?

Required

Lodge the BA7 notice of completion within 7 days.

Do Class 1 or Class 10 buildings need an occupancy permit?

Not required

No occupancy permit is required for Class 1 or Class 10.

Does the bushfire planning pathway apply?

Cannot determine yet

Bushfire designation is not confirmed.

Buildability

Moderate complexity

6 items identified for this block
No major constraints flagged from your answers

Approvals triggered

Owner-builder approval

Must resolve

You intend to build as an owner-builder and the work is above the registration threshold for this building class.

Authority
Building and Energy (owner-builder approvals)
When
Before you lodge the building permit application
Why is this required? → WA owner-builder approval

Planning approval / development application

Needs work

Outside standard residential zoning, a single house commonly needs development approval against the local planning scheme rather than a deemed-to-comply check.

Authority
Local government (planning)
When
Before the building permit application
Why is this required? → Planning WA — residential design codes

Building permit (BA1 certified or BA2 uncertified)

Keep an eye on

All permitted building work needs a building permit. Certified applications (with a certificate of design compliance) have a 10 business day decision period; uncertified Class 1/10 applications have 25 business days.

Authority
Local government as permit authority
When
After planning, owner-builder approval and design are complete
Why is this required? → Building Act 2011 and Building Regulations 2012

Investigations you'll need

Soil classification and wind region

Keep an eye on

Every build needs a site classification (AS 2870) and wind classification to design footings and tie-downs.

Authority
Geotechnical consultant / engineer
When
Before engineering design
Why is this required? → WA application of the NCC

Title search: easements, covenants and notifications

Keep an eye on

Registered easements, restrictive covenants and notifications can dictate where you may build. A Landgate property interest report can also reveal unregistered interests.

Authority
Landgate / your settlement agent
When
Before you sign or before finance approval
Why is this required? → Landgate property interest report

Constraints to plan around

Mapping data comes from Landgate's public location services and Planning WA datasets and is indicative only. The local government and a title search remain authoritative before you commit to a purchase.